Clayson EDI Module Process Solution

发布时间:2026-07-06 分类:Industry News 浏览量:156

1. Feed Water Requirements

No.Parameter NameStandard Parameter RequirementRemarks / Supplementary Notes
1Water SourceRO permeate waterConductivity 1~20μS/cm, optimal range 1~5μS/cm, limit ≤50μS/cm
2pH Value5.0~9.5Optimal operating range 7.0~8.0; Low pH feed water will degrade permeate quality due to dissolved CO₂, feed water hardness shall be kept at a low level
3Water Temperature5~35℃Optimal operating temperature 25℃, short-term maximum temperature ≤40℃
4Feed Pressure0.15~0.5MPa (1.5~5bar)Maximum feed pressure ≤0.7MPa (7bar)
5Differential Pressure RequirementConcentrate inlet pressure < Permeate outlet pressureCore differential pressure control requirement for EDI operation
6Hardness (as CaCO₃)≤1.0ppmLimit requirement under 90% system recovery rate condition
7Total Organic Carbon (TOC)≤0.5ppmNon-detectable is preferred
8Oil & GreaseNon-detectable is preferredOil-containing feed water is strictly prohibited
9Oxidants (Cl₂, O₃)≤0.01ppmBoth free chlorine and ozone shall be controlled, non-detectable is preferred
10Variable-valent Heavy Metals (Fe, Mn, etc.)≤0.01ppmIron, manganese and various variable-valent metal ions shall all be controlled
11Reactive Silica≤0.5ppmTypical content range of reactive silica in RO permeate water: 50~150ppb
12Total CO₂<2ppmWhen total CO₂ exceeds 5ppm, permeate water quality will be significantly affected by CO₂ concentration and feed water pH
13ParticulatesDirect supply of particle-free RO permeate waterIf an intermediate tank is installed, a 1μm pre-filter shall be added at the tank outlet

2. Recommended Process

Two-stage Reverse Osmosis + EDI

3. Process Flow

Ultrafiltration → 1st-stage RO → 2nd-stage RO → EDI