Wastewater reuse · Zhangjiagang, Jiangsu, China
Photovoltaic wastewater reuse, Zhangjiagang: 1,460 T/D reused, 40 T/D discharged
Reduction and reuse treatment for the production wastewater of a photovoltaic company in Zhangjiagang, Jiangsu. Built in two phases with ultrafiltration, softening resin and reverse osmosis, reusing 1,460 T/D and discharging only 40 T/D.
- Industry Photovoltaic manufacturing
- Process UF + softening resin + RO
- Phases 2014 and 2017
- Outcome Near closed loop
- Total reuse
- 1,460T/D
- Discharge
- 40T/D
- Phase 1
- 1,500T/D, 2014
- Phase 2
- 400T/D, 2017
Project overview
This project provides reduction and reuse treatment for the production wastewater of a photovoltaic company in Zhangjiagang, Jiangsu Province. Built in two phases, it uses a combined ultrafiltration, softening resin and reverse osmosis process, with total reuse of 1,460 T/D and a discharge of only 40 T/D, achieving both wastewater reduction and resource recovery.
Process route
Phase 1: pretreatment and low-pressure concentration. The front-end pretreatment completes equalisation, coagulation and sedimentation to remove suspended solids and part of the organic load. Ultrafiltration retains colloids and macromolecules so the membrane system sees a stable feed. Conventional low-pressure reverse osmosis performs the initial concentration, and the permeate goes directly into the reuse system.
Phase 2: silica and fluoride removal plus high-pressure concentration. The phase 1 concentrate first passes through silica and fluoride removal to bring both down, then through softening resin to remove hardness ions in depth and control scaling risk. High-pressure reverse osmosis then achieves high-ratio concentration and volume reduction, recovering more permeate.
Reuse and residue. The reverse osmosis permeate from both phases is collected into the fresh water reuse system and returned to the production process. The high-pressure RO concentrate is treated to meet discharge standard. The result is wastewater minimisation and resource recovery on the same site.
Project information
Project scale: phase 1 1,500 T/D, phase 2 400 T/D. Location: Zhangjiagang, Jiangsu. In service: phase 1 2014, phase 2 2017. Key technologies: ultrafiltration, softening resin, reverse osmosis.