18 years · Four production bases · Wet-tested before shipment

Solutions

Seawater on one side. Effluent on the other.

Two duties account for most of what we build: turning seawater into drinking or process water, and turning a plant’s own wastewater back into water it can use again. Conventional RO for pure water is the third — and we still build it properly.

  • 50 – 20,000 m³/d per system
  • Morocco · Australia · Maldives · Indonesia · Djibouti and more
  • 6 months design to commissioning
  • Wet-tested before shipment

01 · Seawater desalination & SWRO

35,000 ppm in. Under 500 ppm out, every hour of the year.

At seawater salinity the membranes are the easy part. What decides whether the plant runs at 3.2 kWh/m³ or 4.6 — and whether the elements last five years or two — is the intake, the pretreatment and the energy recovery behind them.

  • Feed moves: 35,000–42,000 ppm TDS at 15–32 °C, with algal blooms and silt that shift the pretreatment dose from one week to the next.
  • Energy is the bill: high-pressure pumping is 30–40% of running cost at this salinity. An energy recovery device sized to the real duty cycle is not an optional line item.
  • Permeate is aggressive: below 100 ppm it will eat concrete, brass and mild steel. Remineralisation belongs in the design, not in the after-sales file.
  • Where it goes: islands, coastal towns, ports, power stations, mining camps and resorts — anywhere the pipe from the mainland does not reach.

Route we build

  1. 01Intake screen
  2. 02DAF / media
  3. 03Ultrafiltration
  4. 04Cartridge 5 µm
  5. 05SWRO + ERD
  6. 062nd pass
  7. 07Remineralisation
  8. 08Disinfection

Typical targetPotable < 500 ppm TDS · process < 10 ppm · recovery 35–45% · 3.0–4.0 kWh/m³ with ERD

02 · Wastewater reuse & reclaimed water

Your discharge permit is a water bill you keep paying.

Secondary effluent is the cheapest new water source a plant has — it is already on site, already pumped, and already paid for once. The engineering question is not whether it can be treated. It is which fraction you can return to which point without fouling something downstream.

  • Fouling arrives early: COD, colour and residual coagulant from the upstream clarifier blind a UF within weeks if the dose is not under control.
  • Salinity climbs: every reuse cycle concentrates TDS. Without a controlled bleed or an RO stage, the loop rises until the product fails spec.
  • Biology is live: secondary effluent carries a biofilm load. Without chlorination–dechlorination control, RO elements are colonised in the first week.
  • Match quality to the point of use: cooling make-up, rinse water, boiler feed and flushing do not need the same water — and should not cost the same.

Route we build

  1. 01Secondary effluent
  2. 02Equalisation
  3. 03Coagulation / DAF
  4. 04Ultrafiltration
  5. 05Cartridge 5 µm
  6. 06RO
  7. 07UV / chlorine
  8. 08Reuse point

Typical targetSDI₁₅ < 3 before RO · recovery 60–75% · < 500 ppm TDS for cooling and rinse · < 50 ppm for boiler feed

03 · Zero liquid discharge

No outfall, no excuse. The last 10% is the expensive part.

ZLD is a cost curve, not a switch. The first 85% of the volume leaves through membranes at membrane prices; the last 15% goes through thermal equipment that costs an order of magnitude more per cubic metre. Where you put that split decides the capex, the power bill and whether the plant is still running in year five.

  • Scale starts in the concentrate: CaSO₄ and silica are already saturated before the concentrator. Softening and silica removal belong in front of it, not in the cleaning schedule.
  • MVR is a power contract: 20–40 kWh per m³ of distillate. Feed concentration and compression ratio are the two levers you actually control.
  • The solids are a product decision: mixed salt goes to landfill; separated Na₂SO₄ or NaCl can be sold — and that choice is made at the crystalliser, not afterwards.
  • Turn-down matters: most ZLD plants spend their life at 40–60% of design flow. A train that only works at 100% is a train that never works.

Route we build

  1. 01Softening + TMF
  2. 02RO concentration
  3. 03High-pressure RO
  4. 04MVR evaporator
  5. 05Crystalliser
  6. 06Centrifuge

Typical targetOverall recovery 95–98% · distillate < 10 µS/cm · dry solids to landfill or sale · zero discharge point

04 · Brackish & well water

1,000 to 5,000 ppm: the cheapest water on this page.

Low pressure, high recovery, no energy recovery device needed. All the engineering sits in the front end — iron, manganese, hardness and silica decide the recovery you can actually hold in year three, not the one you wrote in the proposal.

  • Iron and manganese: they oxidise in the cartridge filter and in the first element, not in the media bed where you wanted them to.
  • Silica sets recovery: above roughly 120 ppm as SiO₂ at the concentrate, the last 10% of recovery costs more in antiscalant than the water saves.
  • Nitrate and boron: for potable supply they usually decide whether a second pass is needed at all.

Route we build

  1. 01Oxidation
  2. 02Media filter
  3. 03Softener / antiscalant
  4. 04BWRO
  5. 05Blend or 2nd pass
  6. 06Disinfection

Typical targetProduct < 500 ppm TDS · recovery 70–80% · 0.8–1.5 kWh/m³

05 · Pure, boiler and ultrapure water

The conventional plant — built without the usual corners.

Two-pass RO with EDI or mixed bed, for boiler make-up, pharmaceutical purified water and food-grade process water. It is a well-understood machine. What separates one installation from another is the pretreatment, the controls and the documentation that ships with it.

  • Hardness and silica: at high cycles of concentration even 0.5 ppm carry-over builds a measurable layer on tubes every year.
  • Seasonal feed: surface water changes with the rain. A fixed setpoint either wastes chemical in March or fails spec in August.
  • Documentation: for pharma and food, the loop — slope, dead legs, sanitisation, IQ/OQ records — decides the pass, not the conductivity number.

Route we build

  1. 01Multimedia
  2. 02Carbon
  3. 03Softener
  4. 041st pass RO
  5. 052nd pass / EDI
  6. 06UV + 0.22 µm
  7. 07Loop

Typical target< 0.1 µS/cm with EDI · silica < 20 ppb · TOC < 500 ppb · loop velocity > 1 m/s

Model range

Four families, one catalogue

We do not start from a blank sheet for every enquiry. There is a containerized family from 50 to 2,000 m³/d, a large containerized family from 5,000 to 20,000 m³/d, a brackish family, and a skid-mounted line for anything that does not fit in a box. The model is picked first; the engineering then follows the water analysis.

50 – 2,000m³/d · containerized

Six standard models. Desalination components, piping and controls pre-assembled in one or two containers. Indoor or outdoor, with an energy recovery device. For construction sites, factories, hotels and resorts.

5,000 – 20,000m³/d · 5–20 MLD

Large containerized seawater RO built for speed: major components installed in separate containers, so the plant is a mobile, rapidly built desalination unit rather than a construction project.

100 – 2,000m³/d · brackish

Brackish water RO with most components inside one or two containers — 4,080 to 83,270 litres per hour, sized to the well or the river rather than to a catalogue.

Custommodular / skid-mounted

Integrated pretreatment, RO membranes and automatic control on a skid, customised to the water quality and the output required. Islands, coastal communities and industrial facilities.

Containerized SWRO — standard models
ModelPermeateRecoveryContainersEnergyInstalled power
C502.3 m³/h · 55 m³/d35%20 ft5.93 kWh/m³18.7 kW
C1205.5 m³/h · 132 m³/d40%20 ft5.21 kWh/m³37 kW
C250E11.4 m³/h · 274 m³/d45%40 ft2.73 kWh/m³50.5 kW
C350E16.4 m³/h · 394 m³/d45%40 ft2.70 kWh/m³61 kW
C500E23 m³/h · 552 m³/d45%40 ft2.64 kWh/m³86.5 kW
C1000E45.5 m³/h · 1,092 m³/d45%40 + 40 ft2.58 kWh/m³173.5 kW

Rated on 35,000–36,000 ppm feed at 20 °C. Energy figures are for the RO train and exclude intake and product pumps; installed power covers feed pump, high-pressure pump, energy recovery, CIP, dosing and lighting. Higher recovery or higher permeate flow is available on request — send the water analysis and we will size it.

How it ships

Most of it arrives in a box

A containerized train is not a smaller plant bolted into a steel box. It is the same process — assembled, piped, wired and wet-tested on our floor in Yixing, so the site work is a concrete pad, an inlet, an outlet and a cable.

Cutaway of a 40 ft container showing pretreatment vessels, cartridge filters, RO rack and chemical dosing
40 ft · pretreatment + ROMultimedia and carbon vessels, dosing station and one RO train on a single skid. 100–1,000 m³/d.
Cutaway of a containerized train with ultrafiltration membranes and RO pressure vessels
40 ft · UF + SWROUltrafiltration ahead of seawater RO, with interstage pipework and the control panel inside the same envelope.
Cutaway of a twin-train container with two RO racks and a service aisle
40 ft · twin trainTwo independent RO racks and a walk-in service aisle, so one train can run while the other is cleaned. Up to 5,000 m³/d.

Above roughly 5,000 m³/d, or where the intake sits a long way from the plot, we build in place instead — same skids, no container. The civil, intake and outfall scope is where most of the schedule actually lives, so we price it separately and say so up front.

How we pick the route

The same four steps, whatever the duty

Nobody can size a plant from a TDS number. The route comes out of your water report, your duty cycle and the quality your process actually needs.

01

Full water analysis

Complete lab report — ions, silica, TOC, iron, manganese, temperature and seasonal variation, not one conductivity reading.

02

Route and budget

Mass balance, membrane projection, utility list, footprint and a price range with lead time. Usually inside one working day.

03

Pilot or witness test

Your water on our test bay in Yixing, or a video walkthrough of a running skid on the same duty.

04

Commissioning

Wet test before shipment, then start-up, water-quality verification, O&M manual and operator training on site.

Not sure which one you are

Send the water report. We will tell you which route fits.

Flow rate, raw-water analysis and the quality your process needs — that is enough for a first process design and a budget range.

See the projects
Chat on WhatsApp Email us
Call WhatsApp