Wastewater reuse · Hungary

432 m³/d lithium concentration from NCM cathode wastewater, Hungary

A lithium concentration project for the wastewater produced in high-nickel NCM cathode material manufacturing. In production since 2025 with lithium concentration, ultrafiltration and reverse osmosis, at 432 m³ a day.

  • Industry High-nickel NCM cathode material
  • Low end 50% ≈ 9 m³/h
  • High end 110% ≈ 19.8 m³/h
  • Also supplies Production, domestic and fire water
Capacity
432m³/d (18 m³/h)
Turndown
50– 110%
Online
2025
Process
Lithium concentration + UF + RO
432 m³/d lithium concentration from NCM cathode wastewater, Hungary

Project overview

Located at a company in Hungary and formally in production in 2025. The project addresses the wastewater generated during the manufacture of high-nickel power battery NCM cathode material, applying core technologies including NCM cathode wastewater lithium concentration, ultrafiltration (UF) and reverse osmosis (RO) to build an efficient wastewater treatment and resource recovery system at a treatment scale of 432 m³ per day.

Processing capacity and operating flexibility

Design 18 m³/h, with an operating range from 50% to 110% — about 9 m³/h at the low end and 19.8 m³/h at the high end.

Lithium concentration, ultrafiltration, reverse osmosis

  • NCM cathode wastewater lithium concentration — concentrates the lithium present in the cathode wastewater.
  • Ultrafiltration (UF) — retains suspended solids and colloids, protecting the reverse osmosis membranes behind it.
  • Reverse osmosis (RO) — membrane separation and desalination, producing water that can be reused.

Supporting the local water supply

Alongside recovering the lithium resource, the system provides reliable support for local production water, domestic water and fire-fighting water supply, helping the client improve environmental performance and resource efficiency.

Your site, your constraints

Every site is a different problem. Send us yours.

Feed-water analysis, daily demand and site constraints — footprint, power, operator availability — are enough for a first process route and budget range.

Back to projects
Chat on WhatsApp Email us
Call WhatsApp