50,400 m³/d skid-mounted seawater desalination, Morocco OCP Group

A large seawater desalination project for OCP Group in Morocco, built on a customized skid design: each skid is integrated quickly, shipped in standard containers, and installed on site fast, saving civil works and construction time.

  • Client OCP Group
  • Process Seawater desalination
  • Delivery Skid frames, container transport
  • Site work Minimal civil works
Capacity
50,400m³/d
Hourly output
2,100m³/h
Annual output
≈ 18.4 million m³
Configuration
Customized skid-mounted
50,400 m³/d skid-mounted seawater desalination, Morocco OCP Group

Project overview

A large-scale seawater desalination project built for OCP Group in Morocco. The plant uses a customized skid-mounted design: each skid is integrated quickly, shipped in standard containers, and installed rapidly on site, which saves civil engineering and shortens the construction period.

Why skid-mounted

At 50,400 m³/d the conventional answer is a stick-built plant with a year of civil works. The skid approach inverts that: the process is built and integrated on frames, each frame travels as a standard container load, and the site sees assembly rather than construction.

  • Customized skid design — sized to the project requirement, meeting the 50,400 m³/d seawater desalination duty.
  • Rapid skid integration — each skid is assembled quickly and the whole system can be built up module by module.
  • Standard container transport — skids ship in standard containers, so logistics are simple and costs are controlled.
  • Fast site installation — less assembly work on site.
  • Less civil works, shorter schedule — reduced civil engineering and a shorter construction cycle, which means earlier delivery.

Capacity

Rated output 50,400 m³/d, or 2,100 m³/h. On continuous full-load operation that is approximately 18.4 million m³ a year.

Your site, your constraints

Every site is a different problem. Send us yours.

Feed-water analysis, daily demand and site constraints — footprint, power, operator availability — are enough for a first process route and budget range.

Back to projects
Chat on WhatsApp Email us
Call WhatsApp