1,200 T/D containerized desalination for Zhangzidao Island, Dalian

1,200 T/D of domestic drinking water for Zhangzidao Island. Containerized desalination with ultrafiltration pretreatment, two-stage SWRO and BWRO, and mineralisation, producing water at about 50 mg/L TDS.

  • Location Zhangzidao, Dalian, Liaoning
  • End use Domestic drinking water
  • Technology Containerized desalination unit
  • Configuration Two-stage RO with mineralisation
Product
1,200T/D
Feed
2,800T/D
Product TDS
≈ 50 mg/L after mineralisation
Process
UF + SWRO + BWRO + mineralisation
1,200 T/D containerized desalination for Zhangzidao Island, Dalian

Project overview

1,200 T/D of domestic drinking water for Zhangzidao Island in Dalian, Liaoning Province. The project uses a containerized desalination unit with ultrafiltration pretreatment, two-stage reverse osmosis (SWRO followed by BWRO) and mineralisation, producing water at approximately 50 mg/L TDS.

Process route: UF pretreatment, two-stage RO, mineralisation

Seawater is lifted through the pump house into the raw water tank and drawn from a suction tank. It passes through self-cleaning filtration, ultrafiltration and a cartridge guard filter before entering SWRO. The SWRO permeate then goes through a second brackish RO desalination stage, and the mineralisation system adjusts the water quality before it is supplied as domestic drinking water.

  • Biocide is dosed ahead of ultrafiltration.
  • Antiscalant and reducing agent are dosed ahead of SWRO.
  • Alkali is dosed ahead of BWRO.
  • SWRO concentrate is discharged; BWRO concentrate is returned to the raw water tank.

Project information

Project scale: feed 2,800 T/D, product 1,200 T/D. Location: Zhangzidao Island, Dalian, Liaoning. Key technologies: ultrafiltration, seawater reverse osmosis (SWRO), brackish water reverse osmosis (BWRO) and mineralisation.

Your site, your constraints

Every site is a different problem. Send us yours.

Feed-water analysis, daily demand and site constraints — footprint, power, operator availability — are enough for a first process route and budget range.

Back to projects
Chat on WhatsApp Email us
Call WhatsApp