18 years · Four production bases · Wet-tested before shipment

All projects

Seawater desalination · Morocco

20 MLD containerized seawater desalination, Morocco OCP Group

A 20 MLD (20,160 m³/d) containerized desalination plant delivered to OCP Group, one of the largest industrial operators in Morocco. Most of the integrated UF + SWRO system was pre-installed inside standard ISO containers.

  • Client OCP Group
  • Annual output ≈ 7.36 million m³
  • Commissioned January 2024
  • Configuration Pre-installed in ISO containers
Capacity
20,160m³/d
Hourly output
840m³/h
Process
UF + SWRO
Schedule
6months design to commissioning
20 MLD containerized seawater desalination, Morocco OCP Group

Project overview

A 20 MLD containerized seawater desalination plant delivered to OCP Group, one of the largest industrial operators in Morocco. The integrated UF + SWRO system had most of its components pre-installed inside standard ISO containers, so site work was reduced to installation and connection.

Capacity at a glance

20 MLD — twenty million litres a day — equivalent to 840 m³ per hour, 20,160 m³ per day, and approximately 7.36 million m³ per year on continuous full-load operation (20,160 m³/d × 365 = 7,358,400 m³).

How it works: integrated UF + RO

Seawater enters the ultrafiltration stage, which removes suspended solids and protects the membranes behind it. The filtered water then passes to seawater reverse osmosis, which separates it into fresh permeate and a concentrate brine stream for discharge.

Delivery speed: design to commissioning in 6 months

Five steps, six months: design, container fabrication, transport, site installation, commissioning — completed in January 2024. The overlap between fabrication and design is what makes the schedule possible; it only holds if the process design is fixed early and does not move afterwards.

Your site, your constraints

Every site is a different problem. Send us yours.

Feed-water analysis, daily demand and site constraints — footprint, power, operator availability — are enough for a first process route and budget range.