Seawater desalination · Kendari, Indonesia
3,000 m³/d desalination for the APP Kendari power plant, Indonesia
3,000 m³ of fresh water a day for the process water supply of a 2 × 50 MW station. Multimedia filtration, seawater reverse osmosis and brackish reverse osmosis, with high-pressure pumps and isobaric energy exchangers.
- Client APP Kendari
- End use Boiler and process water
- Configuration Containerized trains
- Application Power station
- Capacity
- 3,000m³/d
- Process
- MMF + SWRO + BWRO
- Plant served
- 2× 50 MW
- Energy recovery
- Isobaric exchangers
Project overview
3,000 m³ of fresh water a day for the process water supply of a 2 × 50 MW power station. The project uses multimedia filtration, seawater reverse osmosis and brackish water reverse osmosis, combined with high-pressure pumping and isobaric energy exchanger technology.
Why the second pass
Boiler duty needs water well below potable quality. The brackish reverse osmosis stage takes the seawater permeate down to the dissolved solids level the boiler can accept, rather than stopping at drinking water standard and leaving the rest to ion exchange.
Energy recovery
At seawater salinity the high-pressure pump is the largest single item in the operating cost, and the isobaric energy exchanger returns most of the pressure in the concentrate to the feed. On a plant running continuously for a power station, that is the difference that shows up in the annual budget rather than on the datasheet.
Your site, your constraints
Every site is a different problem. Send us yours.
Feed-water analysis, daily demand and site constraints — footprint, power, operator availability — are enough for a first process route and budget range.