18 years · Four production bases · Wet-tested before shipment

Water reuse

Double membrane water reuse equipment

1、 Technical requirements: Ultrafiltration filtration method: Technical requirements for water reuse in double membrane method:CNPUMP pump three-phase asynchronous motor V rated voltage: W rated power: model:…

WhatsApp
  • 18-month warranty
  • Factory-direct
  • Wet-tested before shipment

1、 Technical requirements: Ultrafiltration filtration method:

  1. Full flow filtration (opening the inlet valve, closing the concentrated water valve, and opening the production valve to produce only water without impurities) is commonly used for household tap water filtration, but it is not effective in industry as the membrane will quickly clog and shorten its lifespan.
  2. Cross flow filtration (open the inlet valve, open the concentrated water valve, open the produced water valve, adjust the concentrated water valve to achieve a ratio of 9:1 between produced water and concentrated water discharge. If there are too many impurities in the water quality, the ratio needs to be adjusted to 7:3, which will extend the lifespan of the membrane.
    2、 Membrane workflow
  3. Reset all valves (all valves closed).
  4. Positive washing (open the inlet pump and inlet valve, only open the upper valve, close the other valves, so that all water is discharged from the concentrated water outlet. The general cleaning time is 20-60 seconds, and the regular cleaning time is 30 seconds, which can be freely set)
  5. Water production (first open the water production valve, close the upper valve, open the inlet valve, adjust the concentrated water valve, and do not move until the desired ratio is reached. Set the water production time to CNPUMP. Pump three-phase asynchronous motor model: rated power: W, rated voltage: V, rated speed: r/min, rated frequency: Hz, rated current: A. Shell protection level: connection method: insulation level: working system: 1. Total weight: Kg. Factory date: 30 minutes for the southern pump. Other valves can be closed. The water production time can be set by oneself.)
  6. Air scrubbing (open upper valve, open intake valve, close other valves, clean for 60 seconds, regular for 30 seconds, freely set)
  7. Backwash: First, backwash up (open the upper row valve, open the backwash inlet valve and backwash water pump, close all other valves, generally cleaning time 20-60 seconds, regular 30 seconds, freely set), then backwash down (open the lower row valve, open the backwash inlet valve and backwash water pump, close all other valves, generally cleaning time 20-60 seconds, regular 30 seconds, freely set)
  8. The above process is repeated to shut down for chemical cleaning (when the membrane flux decreases by 20% or the transmembrane pressure difference exceeds 1 kg). Cleaning is carried out monthly according to the membrane condition. Alkaline cleaning (sodium hypochlorite 200PPM, sodium hydroxide 500PPM) is used to remove organic pollutants such as bacteria and microorganisms. Acid cleaning (31% hydrochloric acid, 400PPM) is used to remove inorganic substances on the surface of the ultrafiltration membrane, such as iron scale, calcium magnesium scale, etc. Normally, the membrane is washed four times a month. Each time, the chemical cleaning valve and cleaning pump need to be shut down for cleaning. The other valves are closed. After the concentrated water valve has water coming out, the cleaning pump is stopped and the chemical cleaning valve is closed. The membrane is soaked for 60 minutes to 120 minutes, and then the backwash pump is turned on until the water becomes neutral.

Technical requirements for water reuse in double membrane method:
CNPUMP pump three-phase asynchronous motor V rated voltage: W rated power: model: A rated current: Hz connection method: rated frequency: r/min shell protection level: rated speed: 316L seamless pipes are used for the pink pipes, and the fittings on the pipes are connected to the water in Kg total weight:

  1. Working system: Insulation level: JB/T1009-2007. The contact components of the southern pump are all made of 314L material, with a withstand voltage of P=4.0Mpa.
  2. The white pipes are all made of UPVC material, with a pressure resistance of P=1.6Mpa, and the interfaces are connected with loose flanges.
  3. Reverse osmosis, ultrafiltration, and chemical backwashing are separate modules, and the connecting pipes between modules are installed on site according to the actual situation.

After-sales service

A water-treatment system is a 15-year asset. Our service commitment starts the day it is commissioned and does not end with the warranty period.

18-month warranty

Full coverage on the skid, controls and membrane elements from commissioning, extended by agreement for critical plants.

Spare parts in 48 h

Membranes, cartridge elements, dosing pumps and valves held in stock for fast dispatch worldwide.

Remote commissioning

Guided start-up over video with our engineers: pressure set-points, recovery tuning, water-quality verification.

On-site within 72 h

Engineers dispatched for Asia-Pacific and Middle East projects, with local partners for Africa and South America.

What is included with every system

  • Operation and maintenance manual, P&ID and electrical drawings in English
  • Commissioning checklist plus a signed wet-test report from our workshop
  • Two days of operator training on site or online, in English
  • One year of remote water-quality review from your monthly logs

Why plants buy from the factory

Jiangsu Shuangfu Environmental Protection Equipment Co., Ltd. (brand: Huamo / 华膜) has designed and built water-treatment equipment since 2008 — four production bases, one engineering standard.

18years in water treatment
140,000 m²production & warehouse
900+employees, 137 engineers
4manufacturing bases
  • No intermediary margin. You deal with the workshop that welds the skid — quotations come with the real BOM.
  • Imported first-line components. Grundfos / Southern pumps, Dow and Hydranautics membranes, Siemens and Schneider electrics.
  • Wet-tested, not just assembled. Every system runs on real water and is signed off before crating.
  • Certified management. ISO 9001 quality, ISO 14001 environmental and ISO 45001 occupational health & safety.
Production and warehouse hall

Scope of application

One platform, configured per industry — because a pharmaceutical plant and a plating line need very different water.

Chemical Power & boiler feed Photovoltaic Food & beverage Pharmaceutical Electronics

Typical duties

  • Boiler make-up and closed-loop feed water where hardness must stay near zero
  • Ingredient water, bottle rinsing and CIP supply in beverage plants
  • Rinse water for plating, coating and photovoltaic cell lines
  • Pretreatment upstream of EDI, mixed bed or polishing loops

Start with your water analysis

Water analysis first, price second.

Send us your raw-water report, flow rate and quality standard — our engineers reply within 24 hours with a preliminary process design and budget range.

+86 185 5979 9562